Study for realizing effective direct tool-to-tool delivery

  • Twitter
  • Facebook
  • Yahoo!ブックマーク
  • Google ブックマーク
  • Delicious
  • livedoor クリップ
  • はてなブックマーク

document data

著者 CUSCUS
発表日 2005-09-13
種別 その他 (Others)
著作
メタデータ XML

要約(サマリー)

Direct tool-to-tool delivery is one of technical topics for excellent fab performance. Automated Material Handling System (AMHS) vendors supply unified OHT systems that can provide direct tool-to-tool delivery routes. But providing such routes is not sufficient to realize direct deliveries. The purpose of our study is to identify remaining issues required to realize direct tool-to-tool delivery. Our conclusions are (1) AMHS cannot realize direct tool-to-tool delivery by itslef without any degradation of fab throughput, and (2) effective algorithms for lot scheduling / dispatchng and variability reduction of tool process rate are required to realize it without such degradation.

参考文献目録

uploaded by

その他の投稿論文

ユーザーID :
CUSCUS
母国 :
Japan
大学 :
備考 :
ウェブ :
http://d.hatena.ne.jp/CUSCUS/
メール :
k592653@gmail.com
ページトップへ